Home > News

Baoyi undertakes monitoring and splicing large screen project of the whole plant for both high temperature and normal temperature

View: 38701/04/2019  

 Baoyi undertakes monitoring and splicing large screen project of the whole plant for both high temperature and normal temperature. 

The largest domestic waste incineration power plant in eastern guangdong province, which is put into operation in chaoyang district.

 
Lasted 450 days, on December 27, high-profile lian jiang regulation of environmental protection infrastructure projects chaoyang district living garbage incineration power plant start operation.
 
It is introduced the project is the largest so far east guangdong processing covers an area of the smallest construction level highest environmental emissions standards most strict life garbage incineration power plant, realizes the recycling waste from landfill to power generation of new cross, fundamentally solve the problem of chaoyang district urban and rural living garbage pollution, will strongly promote the environmental protection infrastructure construction and river regulation.


CopyRight © 2018-2020 Changzhou BAOYI Mech.& Elec. Instrument Co., Ltd All Rights Reserved.   Sitemap     Designed by
山东群英会出号走势图 龙头彩票开户 奔驰彩票开奖 六合开奖网址 迪士尼彩乐园娱乐 现金彩票注册开户投注平台 河北11选5走势图 今晚六合开奖直播 优优彩票官网 奔驰彩票开奖