Home > News

Baoyi undertakes monitoring and splicing large screen project of the whole plant for both high temperature and normal temperature

View: 52201/04/2019  

 Baoyi undertakes monitoring and splicing large screen project of the whole plant for both high temperature and normal temperature。 

The largest domestic waste incineration power plant in eastern guangdong province, which is put into operation in chaoyang district.

 
Lasted 450 days, on December 27, high-profile lian jiang regulation of environmental protection infrastructure projects chaoyang district living garbage incineration power plant start operation.
 
It is introduced the project is the largest so far east guangdong processing covers an area of the smallest construction level highest environmental emissions standards most strict life garbage incineration power plant, realizes the recycling waste from landfill to power generation of new cross, fundamentally solve the problem of chaoyang district urban and rural living garbage pollution, will strongly promote the environmental protection infrastructure construction and river regulation.


CopyRight © 2018-2020 Changzhou BAOYI Mech.& Elec. Instrument Co., Ltd All Rights Reserved.    Sitemap     Designed by
红狼彩票注册开户投注平台 立鼎彩票注册开户投注平台 上海时时乐 众合彩票注册开户投注平台 时时彩票注册开户投注 利澳彩票注册开户投注平台 广西快3 奔驰彩票开奖 乐胜彩票注册开户投注平台 福建快3走势